Reflecting Pool Upgrade Scheduled To Begin In 2010

Icky Pool
Photo by Hilary Levitin

The Reflecting Pool could be closed for up to two years due to a face lift scheduled to start after this summer’s tourism season, according to the Washington Examiner.

Paths surrounding the pool were eroded over time due to an exorbitant amount of tourists and residents alike passing by on a daily basis. Plus, let’s face it, the water floating around is a less-to-be-desired cesspool at this point.

Building plans for the renovation project include adding a paved, 13-foot-wide walking path on the pool’s perimeter  and changes to the pool’s water system.

Rachel moved to DC in the fall of 2005 to study Journalism and Music at American University. When she’s not keeping up with the latest Major League Baseball news, she works on making music as an accomplished singer-songwriter and was even a featured performer/speaker at TEDxDupont Circle in 2012. Rachel has also contributed to The Washington Examiner and MASN Sports’ Nationals Buzz as a guest blogger. See why she loves DC. E-Mail: rachel@welovedc.com.

Facebook Twitter YouTube 

One thought on “Reflecting Pool Upgrade Scheduled To Begin In 2010

  1. Am I misremembering, but wasn’t the Pool essentially closed (or at least drained) for quite a while just a few years ago? Was that for construction of the WWII Memorial or did they just renovate it?